top of page

ECB® Crack Isolation Membrane


ECB® is a 1mm self-adhering, self-healing, sheet applied membrane designed for use under floor surfaces that require protection from structural movement. The peel and stick membrane bonds permanently to the substrate while remaining flexible enough to protect against substrate movement, providing up to 10mm lateral movement per lineal metre. Fully eliminating the need for control/cold joints, ECB® provides Australia's only 'Seamless Flooring Finish' through the exclusive use of soft joints across the entire floor area. 


Is suitable in a variety of scenarios, including full floor coverage, control joint relocation and in structural and or non-structural strip applications.


ECB® is an ideal solution for shopping centres, airports, apartments, office buildings, access floors and any commercial or residential installations that require reflective crack protection.


Benefits of ECB®:

  • 10mm lateral movement crack protection

  • Lifetime warranty

  • Suitable for exterior and  interior applications

  • Peel & stick, tile over instantly!

  • Eliminates control/cold joints entirely. Full floor soft joint coverage. Seamless finishes!

  • Rigorously tested and compliant to all applicable Australian standards

  • Zero VOCs

  • Ceramic tile underlay not required

  • Compatible with under-floor heating systems

Our Key Projects

AMP Macquarie Shopping Centre, NSW

AMP Macquarie Shopping Centre, NSW

ECB® Classic, 16,000m²

By installing the ECB® Classic Crack Isolation Membrane and utilising only soft joints, we achieved a completely seamless flooring finish that is backed by our "Fracture Free" lifetime warranty. Additionally, our work aided in streamlining this project, resulting in a savings of over 3 weeks for the builder.
The Como Centre, VIC

The Como Centre, VIC

ECB® Classic, 2,100m²

For this project, we used tile-over-tile application of ECB® Classic to provide a seamless floor finish, eliminating the need to remove the existing hard flooring finish. This minimised disruptions and downtime to tenants, saving weeks of time and thousands of dollars.
Perth Airport, WA

Perth Airport, WA

ECB® Classic, 21,000m²

We were engaged to solve a lateral cracking issue in the base slabs of terminals 1 and 2 at Perth Airport. We installed ECB® Classic to protect the terminals’ flooring from reflective cracking. The end result was a lifetime guaranteed, seamless finish.
Greensborough Plaza, VIC

Greensborough Plaza, VIC

ECB® Classic, 4500m²

Tile-over-tile application of ECB® Classic was the method of choice for all involved parties due to the client’s concerns of existing floor demolition causing severe dust issues to the centre’s tenancies. This application not only mitigated the dust issue, but minimised downtime, saving time and money.

Don't want to demolish the existing hard flooring finish?

Apply ECB® directly over the existing floors and tile over instantly. Significantly reduce time, resources, and costs. Contact us to find out how you can achieve a tile-over-tile finish today!

bottom of page